Protergia Structural Maintenance in Power Plant

Structural Maintenance of Cooling Towers in Power Plant Protergia, Aspra Spitia, Voiotia High Pressure Water jetting, Epoxy Resin Injections, Grouting, Corrosion Inhibitors and Waterproofing according to a long term recurring Structural Maintenance & Protection Design.
Vasilikos Desalination Plant, Limassol

Rehabilitation, Waterproofing & Chemical Protection of Desalination Plant Vasilikos Desalination Plant, Limassol, Cyprus Monitoring of concrete cracks (post explosion behavior), Epoxy Injections Sealing, Final Concrete Surface treatment & special mortar rehabilitation of concrete according to the Structural Design. Crystalline Waterproofing, Chemical Resistant Coatings, Pretreatment Precast Slabs Assembly, Joint Sealing & Epoxy Flooring according to the […]
Power Plant Central Chimney

Structural Rehabilitation of Power Plant Central Chimney Vasilikos Power Station, Limassol, Cyprus Monitoring of concrete cracks (post explosion behavior), Epoxy Injections Sealing, Final Concrete Surface treatment & protection according to the Structural Rehabilitation Design. Certification for “work at height” for all involved personnel, after proper training sessions, according to the Project Safety Specifications.
New Hellenic Petroleum Refinery

Shotcrete Fire Proofing of Steel Structures in Refinery Pant New Hellenic Petroleum Refinery, Eleusine Shotcrete, rehabilitation of existing concrete elements, cementitious & epoxy injections, Waterproofing Polyurethane Injections, Epoxy Coatings, Crack Repairing & Joint Sealing according to the Structural Rehabilitation & Upgrade Design.
Rehabilitation of Wind Turbine Foundations

Rehabilitation of Wind Turbine Foundations Several Wind Turbine Parks in Greece & Cyprus Hydraulic Jack Lifting, Specialized Ultra High Performance Grouting by use of appropriate certified mortar pumping equipment (Putzmeister pumps & Grouting mixers) according to the Wind Turbine Manufacture Specifications & the Structural Rehabilitation Design.
Wind Turbine Foundations

Grouting of Wind Turbine Foundations Several Wind Turbine Parks in Greece & Cyprus Specialized Ultra High Performance Grouting in Wind Turbine Foundations by use of appropriate certified mortar pumping equipment (Putzmeister pumps & Grouting mixers) according to the Wind Turbine Manufacture Specifications.
Rehabilitation at Meliti Power Plant

Post Fire Rehabilitation of Power Plant Meliti Power Plant, Florina Removal of post-fire corroded concrete cover, Rehabilitation of concrete elements, Strengthening with multiple layers of Wet Applied Fiber Reinforced Polymers (FRP) & final fire resistant protection with special cementitious mortars according to the Structural Rehabilitation Design.
Rehabilitation of Aliveri Power Plant

Rehabilitation of Ultra High Voltage Power Plant Aliveri Power Plant, Evia Epoxy Resing & P-U Injections, Grouting and Joint Waterproofing according to the Structural Protection Design.